Transportation Capital Program
Fiscal Year 2010
Glossary
The following serves as a guide to terms used in the capital plan:
Capital Investment Strategy Categories
The New Jersey Statewide Capital Investment Strategy (SCIS) classifies projects according to the type of work to be done.
Bridge Assets
Projects designed to keep existing bridges functioning and in a state of good repair, including work which replace bridges or rehabilitates
existing bridges to conform with current design standards.
Road Assets
Projects designed to keep the existing highway system functioning and in a state of good repair, including work which upgrades segments of the
system to current design standards.
Mass Transit Assets
Projects designed to bring the transit system to a state of good repair. This classification includes rail, light rail and bus assets,
including associatedsystems and technology improvements. Mass Transit Asset projects may alsobe funded with National Highway System (NHS)
funds. ISTEA has created a "national highway system," consisting of the interstate highway system andother key highway links. The NHS funding
category has been established to support improvement projects on this key network.
Airport Assets
Projects designed to preserve, maintain and improve New Jersey aviation facilities for the development of an efficient air transportation
system thatresponds to the needs of its users and the public.
Transportation Support Facilities
Projects designed to preserve, maintain and improve physical plant infrastructure including office buildings, rest areas, maintenance
facilities, toll plazas and existing park/ride locations. Bus stops and train stations are included under Mass Transit Assets.
Safety Management
Projects designed to enhance safety and reduce the frequency and severity of crashes.
Congestion Relief
Projects designed to improve the flow of people and goods along transportation corridors.
Multimodal Programs
Projects designed to address improvements and provisions for alternative modes of transportation, such as aviation, goods movement,
bicycle/pedestrian, ferries, paratransit, intermodal connections, rail, maritime and others modes.
Local Systems Support
Projects designed to provide for the development and implementation of transportation improvements on the local roadway network.
Phases of Work
This classification indicates the stage of development of a project as it moves throughthe "project development pipeline."
Planning Study (PLS)
A phase or type of work involving traffic studies needs analyses, corridor studies, and other work preparatory to project development. See
also “Concept Development.”
Concept Development (CD, LCD)
A phase or type of work involving traffic studies needs analyses, corridor studies, and other work preparatory to project development. CD
denotes NJDOT concept development; LCD denotes concept development by a local entity (MPO, county, municipality).
The purpose of concept development is to deliver projects to FeasibilityAssessment with a well-defined need and a recommended concept that has
beenenvironmentally screened and has received community support. Conceptdevelopment includes the following major elements:
- early and intensive public involvement
- an evaluation of project need
- an analysis of physical deficiencies
- environmental screening
- evaluation of alternative strategies/fulfillment of CMS requirements
- definition of potential concepts, limits and/or complimentary strategies as well as staging and phasing opportunities
- address community design/aesthetic opportunities
- order of magnitude cost estimate
The concept development process is divided into the following four phases:
- Background Research and Work Program Development
- Problem Identification and Project Need
- Congestion Management Strategies and Fulfilling Congestion Management System (CMS) Requirements
- Concept Development and Analysis
Feasibility Assessment (FA, LFA)
A phase or type of work intended to develop feasible project proposals that produce the best balance among transportation needs, environmental
values, public concerns and costs. The end products of scoping are: a recommendedscheme with a realistic cost estimate; an approved
environmental document;reasonable assurance that environmental permits can be obtained; community support, or documentation explaining why
such support cannot reasonably beobtained; and identification of right of way (ROW) needs and costs. Scopingconsists of two phases in NJDOT:
Feasibility assessment and final scopedevelopment. FA denotes feasibility assessment by NJDOT; LFA denotes local feasibility assessment by a
local entity (MPO, county, municipality).
Feasibility assessment is the first phase of scoping, during which the Division ofProject Planning and Development performs sufficient
engineering to determine whether the concept emerging from concept development can be feasibly evolved into a project in light of
environmental and community constraints and issues. If it cannot be reasonably demonstrated that environmental approvals and community support
are forthcoming, the concept will neither become a project,nor pass into the Five-Year Capital Program.
During feasibility assessment, project schemes that balance project objectives against environmental, community, engineering and budget
constraints are developed. If alternatives which can resolve the problem to full engineering standards in light of constraints cannot be
developed, then a full range of design and alignment alternatives will be considered, including those which back off desirable standards and
instead meet minimum standards, which drop below minimum standards, or even those which do not achieve one or more of the project goals. In
essence, the Division of Project Planning and Development (DPPD) will systematically “ratchet down” project expectations until a good
fitbetween engineering goals and environmental and political considerations are achieved. This will lead to the development of what has been
termed as theInitially Preferred Alternative (IPA).
During feasibility assessment, the community involvement will generally belimited to coordination with municipal staff and officials,
although, if deemed necessary, the Department may decide to conduct the public meetings normally reserved for preliminary design. This may
include the obtaining of the actual resolution of support from the community governing body.
Feasibility assessment will culminate in a presentation to the ScreeningCommittee regarding the potential project. The Screening
Committee’srecommendations will be presented to the Capital Program Committee for approval. If deemed a worthy project, the project will be
assigned to a ProjectManager and entered into the pool of projects for preliminary design. If the project is determined to be “fatally
flawed,” it will be recommended for termination, or recycled for reconsideration as part of a further concept development.
Preliminary Design (PD, LPD)
Preliminary design is the process of advancing preliminary engineering and obtaining formal community and environmental approval of the
Initially Preferred Alternative. PD denotes preliminary design by NJDOT; LPD denotes local preliminary design by a local entity (MPO, county,
municipality).
During preliminary design, the Project Manager who was liaison for the Feasibility Assessment phase will assume full control of the project. A
number of activities will be simultaneously set in motion, based on the Initially Preferred Alternative(IPA): community involvement,
environmental documentation, and design services.
To obtain the formal community involvement buy-in, a public meeting will generally be arranged, which may lead to some minor adjustments to
the project’s scope. Ultimately, the local officials will be asked to provide a resolution of support endorsing the project.
To obtain the environmental approvals for the IPA, consultation with outside agencies, such as the State Historic Preservation Office may be
necessary. The approved environmental document will be based on technical studies conducted by the environmental teams within the Division of
Environmental Resources, and will generally consist of a Categorical Exclusion. The preliminary design phasewill not be considered complete
until the environmental document is approved.
The preliminary design conducted during this phase will be initiated to facilitate later final design activities. They will be based on the
IPA, and consist of, among other things: development of base plans for final design; development of geometric design sufficiently to clarify
environmental impacts and to define right-of-way parcels; utilities discovery and verification; geotechnical studies (soil borings and
analysis); preliminary drainage work; and development of property acquisition cost estimates.
Project Development PRD—A phase or type of work used by NJ TRANSIT which is intended to develop feasible project proposals that produce the
best balance among transportation needs, environmental values, public concerns and costs.
Design (DES)
A phase or type of work consisting of taking a recommended solution and scopeof work defined in the preliminary design phase and developing a
final design, including right-of-way and construction plans.
Design and Construction (EC)
Funding is provided for both design and construction costs.
Design and Right of Way (ER)
Funding is provided for both design and right of way costs.
Design, Right of Way and Construction (ERC)
Funding is provided for design, right of way, and/or construction costs.
Right of Way (ROW)
A phase or type of work in which the land needed to build a project ispurchased.
Construction (CON)
A phase or type of work involving the actual building of a project.
Capital Acquisition (CAP)
Term used to denote the acquisition of rolling stock by NJ TRANSIT. Statewide Investment (SWI)—NJ TRANSIT uses this designation to describe
a series of coordinated smaller-scale projects in multiple locations, and in multiple phases of work, that address a specific mobility
issue.
Utility (UTIL)
In some cases, the utility relocation work associated with a project must be programmed separately from the actual construction phase of
work. These items are shown under the "Utility" category.
Funding Categories
Projects are funded under various funding categories, depending on the type of work to be done.
DOT Funding Categories
Bridge
This federal-aid funding category provides funds for the rehabilitation or replacement of bridges defined as structurally deficient and/or
functionally obsolete according to federal definitions.
Bridge-Off
This federal-aid funding category provides funds for the rehabilitation or replacement of bridges defined as structurally deficient and/or
functionally obsolete according to federal definitions. This funding is used for bridges that are off the federal-aid system.
Congestion Mitigation and Air Quality (CMAQ)
This federal-aid funding category was established under the federal Intermodal Surface Transportation Efficiency Act (ISTEA) to support
projects which improve air quality and/or relieve congestion without adding new highway capacity. These funds are especially targeted for
states like New Jersey with serious air quality problems.
Demonstration Funds (DEMO)
Federal transportation acts sometime target specific projects in various states in addition to general programs for federal support. This
funding category includes “demonstration” funding provided under ISTEA, as well as “high priority project” funding provided under TEA-21 and
SAFETEA-LU. These projects, for “demonstration” or "high priority project" funding often have special rules applying to their use.
Equity Bonus Program (EB)
This federal funding category provides funding to states based on equity considerations. These include a minimum rate of return on
contributions to the Highway Account of the Highway Trust Fund, and a minimum increase relative tothe average dollar amount of apportionments
under TEA-21. Selected states are guaranteed a share of apportionments and High Priority Projects not less than the state’s average annual
share under TEA-21. This program replaced TEA-21sMinimum Guarantee Program.
Ferry (FERRY, FERRY FTA, FERRY-FHWA DISC)
Federal funds are allocated for the rehabilitation and/or development of ferryfacilities throughout the state.
High Priority Projects (HPP 10, HPP 20)
Federal transportation acts sometime target specific projects in various states in addition to general programs for federal support. This
funding category includes “high priority project” funding provided under SAFETEA-LU. Designatedpercentages are available each year under the
federal legislation. HPP 10 projectfunding is available at the rate of 10%, 20%, 25%, 25% and 20% for each year ofthe legislation). HPP 20
project funding is available at the rate of 20% each yearof the legislation.
Highway Safety Improvements (HSIP)
The primary purpose of this federal funding category is to establish the policy for development and implementation of a comprehensive highway
safety program in each state.
Interstate Maintenance (I-Maint)
A federal-aid funding category has been established to promote resurfacing,rehabilitation, and preventive maintenance on the interstate
system.
National Boating Infrastructure Grant Program (NBIG)
Federal funds are provided to construct, renovate, and maintain tie-up facilitiesfor vessels that are 26 feet or more in length. Activities
eligible for funding are:
- construction, renovation and maintenance of public and private boatinginfrastructure tie-up facilities
- one-time dredging only between the tie-upfacility and the already maintained channel
- installation of navigational aides
- application of funds to grant administration
- and funding preliminary costs.
National Highway System (NHS)
ISTEA has created a "national highway system," consisting of the interstate highway system and other key highway links. The NHS funding
category hasbeen established to support improvement projects on this key network.
Other (OTHER)
This represents funding provided from sources other than state or federal funding. Sources could include the Port Authority of New York and
New Jersey,other state agencies, private developers, counties or municipalities.
Planning (PL, PL-FTA)
This federal-aid funding category provides funds for the federally mandated transportation planning process conducted within each Metropolitan
Planning Organization.
Rail-Highway Grade Crossing (RHC)
This is a federal funding category which is intended to develop and implement safety improvement projects to reduce the number and severity of
crashes at public highway-rail grade crossings. Eligible activities include signing andpavement markings at crossings, active warning devices,
crossing surface improvements, sight distance improvements, grade separations and the closing and consolidation of crossings.
Recreational Trails (REC. TRAILS)
New Jersey's Recreational Trails Program provides grants to public agencies and non-profit organizations for a variety of trail projects. The
NJ Department of Environmental Protection, Division of Parks and Forestry administers the program.
Safe Routes to Schools (SRTS)
This federal funding category provides funds to the states to substantially improve the ability of primary and middle school students to walk
and bicycle toschool safely. The program establishes two distinct types of fundingopportunities: infrastructure projects (engineering
improvements) and non-infrastructure related activities (such as education, enforcement andencouragement programs).
Scenic Byways (SCENIC BYWAY)
This federal funding category recognizes roads having outstanding scenic, historic, cultural, natural, recreational, and archaeological
qualities and provides for designation of these roads as National Scenic Byways, All-American Roads or America's Byways.
Statutory References
State
The "State" or "TTF" category is used to show the disposition of funding receivedfrom the New Jersey Transportation Trust Fund.
Statewide Planning and Research (SPR, SPR-FTA)
Federal law requires a percentage of funds allocated to states for highway improvements to be devoted to planning and research activities.
Surface Transportation Program (STP)
The Surface Transportation Program is a federal-aid funding category established under ISTEA, which encompasses funding previously made
available under various smaller federal-aid categories as well as a broad, flexible component. Funding must be set aside for safety (STP-SY)
and transportation enhancement (STP-TE). Sub-allocations must be made to urbanized and non-urbanized areas (STP-NJ, funding provided to
NJTPA; STP-STU, funding provided to DVRPC; STP-SJ, funding provided to SJTPO).
To Be Determined (TBD)
In the Five-Year Capital Plan, funding for the fifth year (FY 2012) has not yet been determined.
Various Federal (VAR FEDERAL)
This funding category is used to denote unanticipated allocations of Federal funds, outside the parameters of the regular apportionment
process. Until such allocations are made, the exact funding source is not known.
NJ TRANSIT Funding Categories
Transit funding categories are indicated generally by reference to federal statutory categories and are identified as follows:
Casino Revenue
Annual allocation of the 7.5% of the Casino Tax Fund appropriated for transportation services for senior and disabled persons.
COPS (Certificates of Participation)
Funds freed up on existing COPS Notes substituting insurance policy for a cash reserve fund to guarantee payment tothe note holders.
CMAQ (Congestion Mitigation and Air Quality)
This federal-aid funding category was established under the federal Intermodal Surface Transportation Efficiency Act (ISTEA) to support
projects which improve air quality and/or relieve congestion without adding new highway capacity. These funds are especially targeted for
states like New Jersey with serious air quality problems.
FFGA (Full Funding Grant Agreements)
FFGAs are authorized under Federal transit law and are the designate means for providing new starts funds to projects.
MATCH
These are local funds that are needed to match Federal funding (JARC and S5311).
METRO-NORTH
This is funding received from the METRO-North transit agency.
OTHER
Potential federal earmarks or unidentified non-traditional transit funds.
PANYNJ
Anticipated Port Authority of New York and New Jersey funds.
Section 5307
Federal Transit Administration Urbanized Area Formula Program. Includes funding for transportation enhancements (Sect. 5307-TE).
Section 5309
Federal Transit Administration Fixed-Guideway Modernization Program Section 5309D—Federal Transit Administration—Federal Congressional
earmarks to projects.
Section 5316
This is a Federal Transit Administration program which provides funding for selected municipal plans that either increase job accessibility
for the most disadvantaged members of the population, or facilitate reverse commute movements (offering access to employment outside of
the urban centers).
Section 5317
Improved public transportation services, and alternatives to public transportation, for people with disabilities beyond those required by
the Americans with Disabilities Act of 1990 (ADA).
Section 5339
Federal Transit Administration-Federal Congressional earmarks to projects for Alternatives Analysis.
S5310 (Section 5310)
Programs for Elderly and Persons with Disabilities Federal funds are provided for the purchase of small buses or van-type vehicles with lifts
for private or non-profit agencies that serve the elderly and persons with disabilities. (Formerly known as the Section 16 Program)
S5311 (Section 5311)
Non-urbanized Area Formula Program—Federal funding is provided for rural public transportation programs. (Formerly known as the Section 18
Program)
State
The "State" or "TTF" category is used to show the disposition of funding received from the New Jersey Transportation Trust Fund.
Surface Transportation Program (STP)
The Surface Transportation Program is a federal-aid funding category established under ISTEA, which encompasses funding previously made
available under various smaller federal-aid categories as well as a broad, flexible component. Funding must be set aside for transportation
enhancement (STP-TE).
Project Categories
For the purpose of program planning and analysis, transportation improvements are classified into categories, generally defined by the type of
"product" they produce. This classification system improves the department's ability to develop system objectivesand performance measurements.
These classifications are:
Bridge Preservation
This classification includes work, which is designed to keep the existing bridges functioning, and in a state of good repair, including work
which rehabilitates or replaces existing bridges to current design standards. Program categories within this classification include bridge
rehabilitation and replacement, bridge capital maintenance, bridge management, local bridges, NJ TRANSIT bridges, and railroad
overhead bridges.
Bridge and Roadway Preservation
This classification includes work which is designed to keep both existing bridges and roadway in a state of good repair. Under this category,
in addition to roadway improvements, existing bridges within the project limits will berehabilitated or replaced, bringing bridges to current
design standards.
Capital Program Delivery
This classification includes a variety of activities that provide direct support to the capital program pipeline. Program categories within
this classification include program implementation costs, planning program and studies, project scoping and design, right of way and utility,
construction, unanticipatedexpenses, project cost settlement, and transportation grants, corridor studies.
Capital Program Support
This classification includes a variety of “overhead” type activities that indirectly contribute to the project pipeline. Program categories
within this classification include facilities and equipment, contractor support, operational support.
Congestion Relief
This classification encompasses work that improves the flow of people and goods along transportation corridors. Specific programs under this
heading include highway operational improvements, bottleneck widening, missing links, major widening, intelligent transportation systems,
demand management, andcongestion management system.
Intermodal Programs
This classification includes work that addresses improvements/provisions for alternative modes of transportation. Program categories within
this classification include aviation, goods movement, bicycle/pedestrian, ferries, paratransit, intermodal connections, rail, maritime and
other modes.
Local Aid
This classification provides for development and implementation of transportation improvements on the local roadway network. Program
categorieswithin this classification include local aid to counties, local aid to municipalities,local aid discretionary, local aid other
programs, economic development, localroadway improvements, bicycle/pedestrian, regional planning and project development.
Quality of Life
This classification includes work which is designed to enhance the environmentassociated with, or impacted by, transportation improvements.
Program categories within this classification include transportation enhancements, noisewalls, landscape, air quality, signs, wetland
mitigation, environmental remediation and rest areas.
Roadway Preservation
This classification includes work that is designed to keep the existing highway system functioning and in a state of good repair, including
work which upgradessegments of the system to current design standards. Program categories within this classification include highway
rehabilitation and reconstruction, highwayresurfacing, highway capital maintenance, drainage, truck size and weight control, pavement
management system, interagency agreements and dams.
Safety
This classification includes work that is designed to improve safety for the traveling public on the existing highway system. Program
categories within this classification include safety improvements, safety management, and safety capital maintenance, rockfall mitigation.
Metropolitan Planning Organizations
Metropolitan Planning Organizations (MPOs) are planning organizations that serve as the forum for cooperative transportation decision making for
metropolitan planningareas as required by federal regulations. MPOs consist of representatives of state and local governments and major
transportation agencies. There are three MPOs in New Jersey:
DVRPC - Delaware Valley Regional Planning Commission
The MPO covering the counties of Mercer, Burlington, Camden, and Gloucester.
NJTPA - North Jersey Transportation Planning Authority
The MPO covering the counties of Bergen, Essex, Hudson, Hunterdon, Middlesex, Monmouth, Morris, Ocean, Passaic, Somerset, Sussex, Union
and Warren.
SJTPO - South Jersey Transportation Planning Organization
The MPO covering the counties of Cape May, Atlantic, Cumberland, and Salem.
|
|