Looking southwest, epoxy coated steel reinforcement for base slab 6 has been set prior to placing the concrete. The concrete finish machine is located in the bottom right hand corner of the photo.
|
|
Looking southeast at the tunnel west wall. The form work for the west wall sprandel beams and columns creates a picture window effect for the southbound drivers for Route 29.
|
|
Looking northeast at the retaining wall B, the first two rows have been completed as of August 30, 2000. The south portal of the tunnel is just left of the retaining wall B.
|
|
Looking north at the tunnel south portal, closure wall and pilaster on top of the tunnel. Decorative fencing will be placed between the pilasters. Two rows of retaining wall B have been placed on the right hand side of the photo.
|
|
Looking northeast at the south portal entrance to the tunnel. Drivers on southbound Route 29 will be looking through the picture frames and enjoy the scenic view of the Delaware River.
|
|
The view is looking south at the end of the west wall sheet pile.
|