Videos
This video documents the
second part of the New Jersey Department
of Transportation's (NJDOT) $400 million
project to replace the Route 52 Causeway
bridges and the roadway section between
Somers Point and Ocean City, including
the elimination of the Somers Point
Circle.
This phase started in Fall
2009 and included demolition
of two lift bridges and
their replacement with
fixed spans over Ship Channel
near Somers Point and Beach
Thorofare near Ocean City.
Work also includes construction
of the multi-use sidewalk,
improvements in Somers
Point and other features that will
be completed by the end of 2012.
|