Photos

March 2017
name=
Crews inspect a closure pour after a bridge deck placement.
A closure pour fills in the areas of reinforcement between
the sections of the new bridge deck panels.
name=
Crews use a level on the deck
to ensure proper leveling of the deck panel and closure pour.
name=


















This view is of the barge and crane. The deck panels were off-loaded onto the barge and then lifted onto the deck.
name=


















TThis view is of the crane placing a new deck panel onto the bridge into its final placement.