Department of Transportation

Photos

April 2016
name=
name=
name=
These photos are of the pump truck which is used for closure pours. It is filling in the areas of reinforcement between the sections of the new bridge deck panel. The new deck panel is the entire width of the bridge, 46 feet, 3 inches. After the closure pour sets, the surface is "finished" to match the sections of the panel to provide a smooth riding surface

Last updated date: October 28, 2020 10:35 AM