Photos
(click on photos to enlarge)
July 2003
This is a typical approach span segment at the casting yard in Cape Charles, Virginia. A typical segment weighs 70 tons and is 10'1" high, 45'11" from tip to tip and 9'3" long. |
|
July 2003 This is a typical precast pier segment at the casting yard in Cape Charles, Virginia. A typical pier segment is 16' x 8' x 10'. |
|
July 2003
The piers in the water of the new Victory Bridge are supported on drilled shaft foundations. They are 8' in diameter and there are 56 drilled shafts in the project. |
|
|
|