Reinforcing is being installed for the footing at Pier 16. Pier 15 is the other channel pier and drilled shaft work continues at Pier 14 in the background. |
|
September 2003 Casting one of the drilled shafts at Pier 14. The shafts are steel cased measuring 8 foot in diameter with rock sockets 16 feet long. |
|
September 2003
Leveling the tremise seat at Pier 16. This is one half of the complete footing for the channel pier. |
|
September 2003
Workers are chipping the concrete from one of the drilled shafts, preparing for installation of the footing reinforcing. |
|
|
|