Archived Photos
(click on thumbnail photos to enlarge in bottom window)
March 6, 2006
|
Crews form and pour the walls for the staircase of the new pedestrian bridge at New Street. This staircase will adjoin the structure that crosses over the access road alongside the overpass and will attach to the main New Street bridge structure. The bridge itself will have a pedestrian walkway which crosses the highway and will lead to a staircase on the Boyd Park side. |
|
|
|
.
|
|