NJ Home   Services A to Z   Departments/Agencies FAQs
Great Seal of the State of New Jersey
NJDOT Site Index  |  Search: NJ Home   NJDOT
Disclaimer  
Great Seal of the State of New Jersey

route 18 reconstruction graphic


Archived Photos

(click on thumbnail photos to enlarge in bottom window)

January 7, 2008

This view is from the city side of the new Albany Street structure which was built in three sections without interrupting the flow of traffic. Crews set the beams for the center section of this bridge in early January and it is anticipated to be completed in Spring 2008.

Looking south from atop the city side abutment of the new George Street bridge, the view if of the expansion in the width of Route 18 with the separation of express and local lanes. These lanes will merge just before the pedestrian bridge which is in the distance.
The George Street structure will provide access to northbound Route 18 from the southern end of the Rutgers Campus. This will take a heavy traffic burden of the roadways in the center of the city and increase traffic flow for local businesses and the community and greatly reduce the time it takes to move between Rutgers Douglas Campus and the Busch Campus in Piscataway.
.
 
Go to NJDOT home page Contact Us | Privacy Notice | Legal Statement | Accessibility Statement  Go to State of New Jersey home page
  department: home | about | NJ commuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2020
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  May 21, 2008